Lost Worlds – Doha – QatarThis was a large and prestigious temporary exhibition of natural history objects, books and graphics which was installed in the Al Majlis function room at the Sheriton Hotel Doha, Qatar.
Reed Engineering was the main electrical contractor for the project. It provided engineering, systems design, materials sourcing, supply and the installation of all electrical equipment used to provide electrical distribution and dimming from the venue supply, light the exhibition with stage lighting, install fibre-optic fittings and provide local power supplies and emergency fittings, together with a crew for the install and de-rig, and a technician to support the system during the run.
“In all areas Reed Engineering provided equipment and services of the highest standard together with competent documentation for export and import and matters of Health & Safety.”
Doug Bullock |


